AWF Krakow, Poland
High school for sports education.
Key Facts
布置方式:
New build sports pool tank:
Re-profiling the concrete; waterproofing installation transitions; insulating the pool tank and wet areas; joint sealing with jointing tapes in the overflow channels; installing ceramic tiles; filling the movement joints and seams.
物件大小:
2200 m²
完成日期
2012
产品
位置:
波兰
/ Krakau
建筑师:
ABM Solid S.A.
涂敷商:
ABM Solid S.A.