Tauragé swimming pool, Lithuania
The newly constructed swimming pool in Tauragé offers it's guests a 25 m pool and a sauna.
Key Facts
布置方式:
It commenced with the levelling of the walls to the swimming pool tank. Then the swimming pool tank, sauna and areas adjacent to the pool were waterproofed after which the tiles could be laid.
建筑工程类型
新建工程
工作持续时间:
12 个月
产品
位置:
立陶宛
/ Tauragé
涂敷商:
UAB Brosta
Sodų g. 7, Pareizgupio k., LT-60195