Indoor swimming pool Wesseling
The Wesseling indoor swimming pool had been closed since August 2018. The pool, which was opened in 1966 had to be extensively modernised in order to conform to today's technical requirements and legal regulations. The renovation, originally planned for the summer of 2022 had to be postponed due to unexpected challenges and the Corona pandemic. The entrance area and the Foyer for example was rejigged as well as complete renovation of the teaching pool and the sports pool. The re-opening took place on the 13.05.2023.
Key Facts
布置方式:
Demolition of the existing finishes, preparation of the substrate, priming, levelling the substrate, waterproofing, tile installation and grouting
建筑工程类型
翻修
物件大小:
4500 m²
完成日期
4/2023
位置:
德国
/ Wesseling
涂敷商:
Fliesen Lepping GmbH & Co.KG
Max-Planck-Straße 2
48691 Vreden
规划师:
Planteam Ruhr