SaLü Salztherme Lüneburg
Renovation in many construction phases
Key Facts
布置方式:
The conversion of the project was carried out in 3 construction phases, all of which were planned by bs2 Architects with tiling works carried out by Heidrich Fliesen GmbH.
In some areas the existing finish and build-up was taken back to the shell whilst other areas were newly constructed.
建筑工程类型
翻修
物件大小:
18000 m²
完成日期
2021
产品
位置:
德国
/ Lüneburg
建筑师:
bs2architekten GmbH
Ruhrstraße 11A
22761 Hamburg
涂敷商:
Heidrich Fliesen GmbH
Zernitzer Dorfstraße 40
16845 Zernitz-Lohm