Schulzentrum Horn-Bad Meinberg
Renovation of the secondary school II school centre
Key Facts
布置方式:
The substrates were prepared and the external surfaces waterproofed, a coved fillet produced and perimeter insulation adhered. (300m²
of waterproofing with AQUAFIN-RB400, 300m² substrate preparation with ASOCRET-M30, 160 linear metres of coved fillet with ASOCRET-M30, ca. 200m² perimeter insulation with COMBIDIC-2K/CLASSIC)
建筑工程类型
翻修
物件大小:
300 m²
完成日期
2021
位置:
德国
/ Horn-Bad Meinberg
涂敷商:
Piechottka Bau