Business Stadium Central
The waterproofing system for the particular solution of the BSC Pool with Spa area and waterspout fountain was delivered by UAB "SCHOMBURG Baltic“ – a subsidiary of the German company "SCHOMBURG GmbH & Co KG“ in the Baltic states.
Photos: Laimonas Ciūnis (STRUCTUM archive)
Key Facts
Type of Installation:
Offices and commercial buildings
- Grouting
- Screed installation
- Tile compound waterproofing
- Waterproofing
Type of Construction Work
Reconstruction
Characteristics
This is a unique project, the like of which is unequaled in Lithuania. The building has a complex construction and the swimming pool with Spa area is located at the top on the eighth floor and protrudes from the building and hangs like a balcony to the slab.
Object size:
25 m²
Completion date
1/2026
Duration of Work:
36 months
Products
Location:
Lithuania
/ Vilnius
Architect:
Zaha Hadid Architects
101 Goswell Road
London EC1V 7EZ
United Kingdom





