Key Facts
Type of Installation:
Swimming pool / Indoor pool / Outdoor pool / Swimming pool
Arrangements:
New construction of a 25m swimming pool, complete system solution with SCHOMBURG products:
* Waterproofing of construction joints
* Levelling the walls
* Waterproofing and priming the pool tank and pool surround
* Waterproofing pipe penetrations
* Joint grouting and capillary barrier behind the pool edge
* Installation of ceramic tiles (from AGROB BUCHTAL)
* Grouting the tiles in the pool tank and on the pool surround
* Joint sealing
- Construction joints
- Floor patching / Floor leveling / Substrate leveling
- Grouting
- Joint filling
- Joint sealing
- Primer
- Tile laying
- Wall patching
- Waterproofing
- Waterproof tape technology
Type of Construction Work
New Construction
Object size:
625 m²
Completion date
2015
Products
Location:
Slovakia
/ Veľký Meder
Architect:
ADIF Atelier, Dunajská Streda
Applicator:
OSP DANUBIUS DS s.r.o.