Havel-Therme Werder, Germany
After the construction of the thermal baths had been started in 2011 and was to be opened under the name Blüten-Therme in 2012, the building shell of the half-completed thermal baths stood unused for many years on the banks of the Zernsee. Only in 2019 was the build continued with a new investor and the thermal baths completed at the end of 2020.
Key Facts
Type of Installation:
Swimming pool / Indoor pool / Outdoor pool / Swimming pool
Arrangements:
• Levelling of the substrates
• Waterproofing and installation of tiles and natural stone slabs
- Floor patching / Floor leveling / Substrate leveling
- Grouting
- Joint filling
- Joint sealing
- Natural stone laying / Tile laying
- Penetrations / Inlets
- Primer
- Sealing
- Tile compound waterproofing
- Tile laying
- Waterproof concrete
- Waterproof tape technology
Type of Construction Work
New Construction
Object size:
12000 m²
Completion date
2020
Products
Location:
Germany
/ Werder
Architect:
Geising + Böker Architekten BDA
Applicator:
Fliesen Lepping GmbH & Co. KG
Applicator:
Hilpert GmbH & Co. KG