Installation on metal and stainless steel
It is necessary to clean the substrate until free from grease and remove any possible existing corrosion. Where necessary the metal must be abraded and primed. Prime structural steel twice with ASODUR-GBM. Wipe over stainless steel sparingly with ASO-Primer-S. Before installing tiles, apply an intermediate flexible layer of ASOFLEX-AKB. Due to the range of metals, we recommend seeking technical advice for the application.
PRIMING |
|
|||||||||||||
WATERPROOFING |
|
|||||||||||||
TILE INSTALLATION |
|
|||||||||||||
GROUTING |
|